Browsing by Author "Özfirat M.K."
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item A facility layout problem in a marble factory via simulation(Association for Scientific Research, 2011) Edis R.S.; Kahraman B.; Araz O.U.; Özfirat M.K.The marble factory in this study is a typical instance of a flow shop based production system. Adding new machines to the plant and/or introducing a new product may convert the actual layout to an inefficient one. Such cases may cause a significant increase in transportation of materials between machines that decreases the utilization rates of machines and operators as well as overall productivity. Therefore, facility planning is a key issue in marble plants in terms of total cost and customer satisfaction. Another important property of these plants is its dynamic and stochastic behavior in terms of scrap rates, demands and processing times. The aim of this study is to develop an efficient plant layout for such dynamic systems. At first, the simulation model of the current system is built on ARENA 10.0. Then, an alternative layout is generated after some analysis and then, it is evaluated via simulation model. The proposed layout provides reduction in total transportation time as well as an increase in productivity. © Association for Scientific Research.Item Selection of coal transportation mode from the open pit mine to the thermic power plant using fuzzy analytic hierarchy process(Vilnius Gediminas Technical University, 2018) Özfirat P.M.; Özfirat M.K.; Malli T.Coal produced in open pit mines should be moved to thermic power plants for production of power. Thermic power plants require very large amounts of coal. In transportation process of this coal, both costs and technical parameters should be considered. Common alternative transportation modes in this process are belt conveyors, truck types, suspension rail conveying systems, pipelines and railways. Selection of one of these modes is influenced by transportation distance, inclination of the haulage road, amount of coal reserve, investment costs, production capacity and unit production cost of the open pit mine. In this study, advantages and disadvantages of alternative transportation modes are analysed using Fuzzy Analytic Hierarchy Process (F-AHP). The results revealed, belt conveyors and trucks transportation by are superior to others. © 2016 Vilnius Gediminas Technical University (VGTU) Press.