Skip to main content
English
Català
Čeština
Deutsch
Español
Français
Gàidhlig
Italiano
Latviešu
Magyar
Nederlands
Polski
Português
Português do Brasil
Srpski (lat)
Suomi
Svenska
Türkçe
Tiếng Việt
Қазақ
বাংলা
हिंदी
Ελληνικά
Српски
Yкраї́нська
Log In
Email address
Password
Log in
Have you forgotten your password?
Communities & Collections
All Contents
Statistics
English
Català
Čeština
Deutsch
Español
Français
Gàidhlig
Italiano
Latviešu
Magyar
Nederlands
Polski
Português
Português do Brasil
Srpski (lat)
Suomi
Svenska
Türkçe
Tiếng Việt
Қазақ
বাংলা
हिंदी
Ελληνικά
Српски
Yкраї́нська
Log In
Email address
Password
Log in
Have you forgotten your password?
Home
Araştırma Çıktıları | Web Of Science
Web of Science Koleksiyonu
English
English
No Thumbnail Available
Date
Authors
Civelek, Z
Lüy, M
Cam, E
Mamur, H
Journal Title
Journal ISSN
Volume Title
Publisher
0960-1481
Abstract
PERGAMON-ELSEVIER SCIENCE LTD
Description
Keywords
In the world, efforts to increase the resource diversity in electric generation have accelerated lately. So, the great improvements have been achieved in wind turbines (WTs). The dimensions of WTs have grown for more electric generation and their energy productions have increased. Depending on these developments, it has become more important to reduce the WT load mitigation. Thus, a tendency to pass an individual pitch angle system control rather than a collective pitch angle system control employed to stable the output power of WTs over nominal wind speeds has whetted in recent studies. However, in literature, a controller proposal relating to how to incorporate the blade moments used for providing the individual pitch angle system into the output power control system has not yet been offered. Therefore, in this study, a new fuzzy logic proportional control (FL-P-C) approach has been recommended to mitigate the moment load on blades and tower to a minimum possible value while keeping the output power of WTs at a constant value. The offered FL-P-C has also been verified by MATLAB/Simulink. Through the first application of the FL-P-C on a WT, a significant improvement of 33-83% has been managed for the blade and tower moment loads. Furthermore, the grid fluctuations have been reduced because of the stabilisation of the output power of the WT. Ultimately, by the offered FL-P-C, not only the WT load mitigations and maintenance costs of WTs could be reduced, but also electric costs could be decreased owing to increasing lifetimes of WTs. (C) 2017 Elsevier Ltd. All rights reserved.
Citation
URI
http://akademikarsiv.cbu.edu.tr:4000/handle/123456789/7239
Collections
Web of Science Koleksiyonu
Full item page