Skip to main content
English
Català
Čeština
Deutsch
Español
Français
Gàidhlig
Italiano
Latviešu
Magyar
Nederlands
Polski
Português
Português do Brasil
Srpski (lat)
Suomi
Svenska
Türkçe
Tiếng Việt
Қазақ
বাংলা
हिंदी
Ελληνικά
Српски
Yкраї́нська
Log In
Email address
Password
Log in
Have you forgotten your password?
Communities & Collections
All Contents
Statistics
English
Català
Čeština
Deutsch
Español
Français
Gàidhlig
Italiano
Latviešu
Magyar
Nederlands
Polski
Português
Português do Brasil
Srpski (lat)
Suomi
Svenska
Türkçe
Tiếng Việt
Қазақ
বাংলা
हिंदी
Ελληνικά
Српски
Yкраї́нська
Log In
Email address
Password
Log in
Have you forgotten your password?
Home
Araştırma Çıktıları | Web Of Science
Web of Science Koleksiyonu
English
English
No Thumbnail Available
Date
Authors
Sahin, M
Kellegz, T
Journal Title
Journal ISSN
Volume Title
Publisher
0020-7543
Abstract
TAYLOR & FRANCIS LTD
Description
Keywords
Assembly lines are widely used in industrial environments that produce standardised products in high volumes. Multi-manned assembly line is a special version of them that allows simultaneous operation of more than one worker at the same workstation. These lines are widely used in large-sized product manufacturing since they have many advantages over the simple one. This article has dealt with multi-manned assembly line balancing problem with walking workers for minimising the number of workers and workstations as the first and second objectives, respectively. A linear mixed-integer programming formulation of the problem has been firstly addressed after the problem definition is given. Besides that, a metaheuristic based on electromagnetic field optimisation algorithm has been improved. In addition to the classical electromagnetic field optimisation algorithm, a regeneration strategy has been applied to enhance diversification. A particle swarm optimisation algorithm from assembly line balancing literature has been modified to compare with the proposed algorithm. A group of test instances from many precedence diagrams were generated for evaluating the performances of all solution methods. Deviations from lower bound values of the number of workers/workstations and the number of optimal solutions obtained by these methods are concerned as performance criteria. The results obtained by the proposed programming formulations have been also compared with the solutions obtained by the traditional mathematical model of the multi-manned assembly line. Through the experimental results, the performance of the metaheuristic has been found very satisfactory according to the number of obtained optimal solutions and deviations from lower bound values.
Citation
URI
http://akademikarsiv.cbu.edu.tr:4000/handle/123456789/6730
Collections
Web of Science Koleksiyonu
Full item page